Thermal Power Generation Plant

Project: EPC Thermal Power Generation Plant.

Client: Empresa Eléctrica Valle Hermoso S.A. - EVH.

Scope of Work: An EPC project, which included the supply of all equipment and materials, transportation, installation and startup of one turbine of 32 MW each in simple cycle and fuel gas system. The Balance of Plant (BOP) covers the following systems, gas treatment and compression, air for services and instruments and a control room. Besides a 115 KV Bay that consists of disconnectors, lightning rods, measurement transformers and switches. It also included the training of personnel responsible for the operation and maintenance of the plant.

Installed capacity: 300 MW.

Impact: “El Alto” International Airport and communities of La Paz and El Alto.
 

Roads Project

Project: Road El Alto- Huarina.

Client: ABC Administradora Boliviana de Carreteras.

Scope of Work: Construction of a two way roads, including: shoulders, 16 pedestrian walkways, 14 bridges and 130 drains. This road is the second main road in Bolivia which communicates with Peru. The project includes earthworks, paving, structures, walkways and bridges, drainages and road signs.

Lenght: 56 km.

Impact: Communities Department La Paz.

Contact

Main Offices, Caracas

Av. Francisco de Miranda, Centro Empresarial Galipán,Torre C, Piso 7. Caracas – Venezuela.
Phones: +58-212- 901.36.11 / 901.37.00 al 04.
Fax: +58-212-901.36.11
Email for iIformation and Business is: This email address is being protected from spambots. You need JavaScript enabled to view it.
 
Email for Human Resources is: This email address is being protected from spambots. You need JavaScript enabled to view it.

 

Indigo Energy International, C.A.
RIF. J - 29500043 - 0
Todos los derechos reservados 2015.

  

We use cookies to improve our website. By continuing to use this website, you are giving consent to cookies being used. More details…